Great problems with waste

12-03-12 (2) Pt horst-fracture board-425

hydraulic hoist of which the hospital has several but the staff are not trained in their use and have therefore not used them.

hydraulic hoist of which the hospital has several but the staff are not trained in their use and have therefore not used them.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *


Required